The construction and installation of the gymnasium membrane structure usually involves the following main steps and processes:

Preparation:

Design and planning: Determine the specific shape, size and supporting structure of the membrane structure according to the design drawings and engineering requirements.

Site preparation: Clean the construction site and ensure that the ground is flat and meets the construction requirements.

Support structure installation:

Steel structure erection: According to the design plan, the support structure, including trusses, columns and beams, is installed first to support the overall shape and load-bearing capacity of the membrane structure.

Membrane material preparation and processing:

Membrane material pretreatment: The prefabricated membrane material is transported to the site and cut and processed as needed to adapt to the actual installation size and shape.

Membrane structure installation:

Tensile membrane material: The membrane material is fixed to the pre-installed support structure, usually by tensioning and fixing it to the trusses and support points.

Heat-sealed connection: If heat-sealed membrane material is used, heat-sealed treatment is required at the joints to ensure the integrity and waterproof performance of the membrane material.

Fix and adjust:

Fix the membrane material: Use a dedicated fixing system, such as membrane clamps, cables and tensioning devices, to ensure that the membrane material is close to the supporting structure and flat.

Adjust the tension: adjust the tension and shape of the membrane material to achieve the appearance and function required by the design.

Installation of auxiliary facilities:

Drainage system: install an appropriate drainage system to ensure the smooth discharge of rainwater and accumulated water.

Lighting and ventilation: install lighting equipment and ventilation systems as needed to improve the comfort of the gymnasium.

Acceptance and commissioning:

Inspection and testing: conduct overall inspection and testing to ensure the installation quality and stability of the membrane structure.

Adjustment and correction: make necessary adjustments and corrections based on the findings during the acceptance process to meet the design and safety requirements.

The construction and installation of the stadium membrane structure requires a high level of technology and professional equipment. Especially in the processing and installation of membrane materials, precise operation and strict quality control are required to ensure the stability, durability and aesthetics of the overall structure.