Dapeng Town Industrial Park, Tongshan District, Xuzhou City, Jiangsu Province, China
The African continent is entering a golden age of infrastructure development—from South Africa’s Red Rock solar thermal power station and Guinea’s Massaké railway to Angola’s electrolytic aluminium plant, green energy and industrialisation projects urgently require highly durable, low-maintenance building structures.

Optimal full lifecycle cost
50-year extended service life: Through triple anti-corrosion technology (zinc-rich primer + epoxy micaceous iron oxide intermediate coat + fluorocarbon topcoat), the main structure remains corrosion-free even in West Africa’s salt-erosion coastlines and East Africa’s high-humidity rainy seasons.
98% Material Recyclability: Upon project decommissioning, steel components can be directly remelted for reuse, eliminating concrete construction waste accumulation and aligning with Africa’s sustainable infrastructure policies.
Hard Technology for Extreme Environments
High-Temperature & High-Humidity Protection: Utilising epoxy glass flake coating (120°C heat resistance + salt spray impermeability), successfully deployed at Algiers Airport (50°C desert conditions) and Angola’s electrolysis workshops (85% humidity).
Seismic Safety Certification: Node tolerances controlled within ±2mm, meeting seismic design requirements for magnitude 9 earthquakes (e.g., the 265-metre minaret of Algeria’s Grand Mosque, Africa’s tallest building).
Rapid Delivery, Time and Labour Savings
Bolted spherical grid structures achieve over 90% prefabrication, accelerating on-site assembly by 60% compared to traditional methods and mitigating rainy season delays (e.g., Guinea’s Massi Railway dry-season accelerated construction).
|
Challenge |
SAFS Technical Response |
User benefits |
|
Sea freight costs are prohibitively expensive |
Lightweight design (30% steel reduction + compact packaging) |
Logistics costs reduced by 45% |
|
Local welding expertise is inadequate |
Fully bolted connection, eliminating the need for complex welding |
Quality is controllable, with installation training requiring only two weeks |
|
Unstable electricity supply |
Integrated Solar Roofing Solutions |
Reduce operational energy consumption by 20% |