How to commission steel structure space frame

2023-08-02

Commissioning of steel structure space frame is a more complicated process, which requires sufficient planning and preparation to ensure smooth construction process and stable project quality.SAFS Steel Structure Engineering Co., Ltd. will introduce how to carry out the commissioning of steel space frame and list out the relevant precautions.

Steel structure space frame commissioning

Steps for commissioning a steel structure space frame

1. Preparatory work: Before starting the construction, relevant preparatory work needs to be carried out, including the procurement of materials, the drawing of plans, the formulation of engineering plans, safety measures and so on. In this step to ensure that all the materials, tools and equipment to be used are ready, as well as site fixing, hanging and other construction conditions to meet.

2. Dimensioning: Before dimensioning, fine scanning and testing are required to ensure the accuracy of the dimensions. The design drawings involved should be compared in detail and the materials should be processed according to the requirements of the drawings to ensure the accuracy of the dimensions of each part of the space frame.

3. Welding fabrication: When welding fabrication is carried out, attention needs to be paid to a variety of issues, such as ensuring the safety of operators and the construction environment, welding parameters and technology should meet the relevant standards, real-time monitoring of the implementation of the standards during the welding process, and compliance with welding safety regulations.

4. Correction of assembly errors: After completing the process, a thorough inspection and testing is performed to ensure that all components have been assembled in the intended sequence and in accordance with the requirements. If assembly errors are found, they need to be corrected promptly to eliminate safety hazards.

5. Acceptance: acceptance is the final step in the commissioning of the steel structure space frame. In the process of acceptance, it should be carried out in strict accordance with the relevant standards, requiring the acceptance personnel to implement meticulous and careful, review the details of the whole project one by one and identify all the existing problems.

Precautionary note

1. Safety: The construction site is a place where safety accidents are easy to occur, so the space frame manufacturer must have a strict management system for the site, strengthen the site safety protection, and strictly abide by the safety regulations. The commissioning work of steel structure space frame requires cutting, welding and other tools, so the staff must have strong professional skills and experience in operating tools to ensure the operation process and safety.

2. Production standards: The engineering quality and service life of the steel structure space frame commissioning must be guaranteed, so it is necessary to strictly abide by the relevant material standards and construction standards. Calculations are also needed to ensure the stability of the whole project and the reliable quality of each component.

3. Reasonable arrangement of time: the commissioning of steel structure space frame is a complicated project, and if the time is not reasonably arranged, it is likely to have a compromise on quality. Therefore, it is necessary to plan and reasonably arrange the time limit according to the actual situation when making the project plan.

4. Accurate measurements: Dimensioning is a critical aspect of steel structure space frame commissioning, so it is important to measure and proofread material dimensions accurately. When proofreading the material size, it should prevent the project from being stalled due to power outages and other inability to continue work, and it is necessary to use specific materials to double-check the material size to ensure accurate measurement.

5. Maintenance of cleanliness: During the commissioning of steel structure space frames, failure to clean up castings, tools and other recyclable materials in a timely manner often results in delays in the duration of the project, a reduction in the efficiency and quality of the work, and also poses a safety hazard for the workers at work. Therefore, it is very important to cause this point.

Summarize

In conclusion, the steel structure space frame commissioning project needs to strictly adhere to the relevant regulations and standards, and pay attention to safety. The staff should have enough professional knowledge and experience, adhere to the rigorous attitude, ensure the stability of the project quality, and meet the needs of modern engineering control. By solving the above problems, the road of steel structure space frame commissioning will be more robust and the engineering process more optimized, thus promoting the rapid development of China’s industrial society.