Quotation and budget for steel structure workshop

2023-03-17

There are many advantages of steel structure factory buildings, such as light weight, can effectively improve space utilization rate, green environmental protection and can be reused, etc., but I believe that all owners care about its quality and materials, but also the price, as follows It is the quotation and budget introduced by SAFS steel structure.

First of all, we need to measure the area of the factory building we need to make, and then choose the size of the factory building we need to make according to the area. After knowing the approximate area of the factory building, we can directly consult the manufacturer for the price. Now we can directly check the price of steel on the Internet, and we can estimate it by ourselves. The approximate price, and then directly discuss the factory price of the area you need with the manufacturer. Generally, the manufacturer’s quotation will be higher than your own estimate, so you need to negotiate the price with the manufacturer, understand the specific fee collection items, and let the manufacturer know. You are a professional, and there will be no arbitrary charges. Of course, the steel structure company’s quotation is very clear, and they will clearly list the charging items to the owner, so that the owner can clarify these fees.

Secondly, after negotiating the price, it is necessary to consult the steel structure manufacturer whether to provide manual installation service and how to charge the fee. Many customers only find out that they only provide materials after signing the contract, and the manual installation fee needs to be paid separately. Such things It happens from time to time, so when negotiating the price and signing the contract, it is necessary to know clearly whether the manufacturer’s quotation includes the cost of manual installation.

After the frame of the steel structure factory building is installed, doors and windows need to be installed. You can go shopping in the building materials market and buy some cost-effective doors and windows. You can also paint the paint later, which can save costs, although it may take a long time. It’s a little longer but the steel structure factory building is built in this way, and the price is also within the budget.

Therefore, it can be seen from the above that the budget method provided by the steel structure company is still feasible. It is not too difficult for us to estimate the price. As long as we know the price of materials, labor, and door and window paint, we can also reduce the cost. To the minimum, even if there is a difference between the price of the finished product and the finished product, it will not be too big.