home Application Stadium Roof

Olympic Park Main Stadium Steel Structure Project

stadium,steel structure
Advantages of designing the main stadium of the Olympic Park 0
stadium,steel structure
stadium,steel structure
  • Area 209,884㎡
  • Completion date 2013.9
  • Life span 50 years
  • Wind load 0.5 KN/㎡
  • Steel material Q235B, Q355B

Advantage

Advantages of designing the main stadium of the Olympic Park
  • 80% of production can be finished at factory

  • Easy and fast installation

  • Cost-effective

  • High security

  • Roof and side enclosures can be installed on the ground and lifted successfully once

The main stadium is constructed with a frame structure and a steel roof, and the exterior material of the stadium is made of perforated stainless steel plates, which makes the appearance of the whole stadium more aesthetic. This material is the first used in the southern region. At present, The Olympic Park has become a landmark project of public sports infrastructure construction.