Steel structure space frame roof structure news technical knowledge
home News Trade News

Common problems in the installation of the top of the steel structure workshop

2022-10-24

Steel structure workshops are the most popular among modern building structures. During the installation of the top of the steel structure workshop, the construction personnel will encounter the following five problems:

Prefab Workshop Warehouse

  1. Gutters are usually placed on the eaves to form an outer gutter. The distance between the outgoing members of the eaves is taken as the column distance, that is, the outgoing members are used as part of the main steel frame. The typical eaves structure is connected by C-shaped steel purlins between the protruding members;
  2. The prepared paint should not be left for too long, and the paint should be prepared on the same day. The use of concentrates should be implemented in accordance with the requirements of the instructions, and cannot be increased arbitrarily;
  3. The environmental brightness and humidity during the coating of the top of the steel structure workshop should be consistent with the requirements of the coating product specification. When there are no special requirements in the product manual, the ambient temperature should be between 6 and 39°C, and the humidity should not be greater than 86%. There should be no condensation on the components during painting;
  4. It should be protected from rain for 4 hours after painting. The parts that cannot be painted shall not be painted in the installation drawing. Conflict surfaces between welds and high-strength bolts should not be painted for the time being. After the on-site construction is completed, no anti-corrosion paint is applied to the welds and high-strength bolt joints;
  5. Installed on the top of the steel structure workshop, the eaves column bears the vertical load and wind load of the light wall transmitted by the C-shaped steel wall beam, and the eaves beam mainly bears the gutter water full load or snow load. The sections of the eaves components, such as eaves columns, eaves beams, etc., are usually made of rolled I-beam or high-frequency H-beam, and the section size is determined by the bearing capacity calculation.

 

The eave column and the eave beam are regarded as a whole, and the ends are connected with the steel frame column, that is, it is calculated as a cantilever construction. Under normal circumstances, the eaves of the steel structure workshop bear less load, and the section usually chooses high-frequency welded H-beams with a height of 200.

hentai de hentaispa.com hetani anime tamilnudesex pornstarporntrends.com deshi porns افلام نيك ورعان anamutfak.com سكس الغردقة white pussy hornyanaltube.net seduce xxx mkv movie download directorio-porno.com hellmoms sex stories audio brownporntube.net hospital xvideos blue video blue film manytubeporn.mobi tamil blue film hot sprank bang erovoyeurism.com sex.xnxx aunty mms video momyporn.mobi kannada lucky movie songs kerala aunties nude images pornoko.net kannada hot سكس ايرلندى babezporn.com افلام سكس زوجه الاب romi rain daftsex myxxxbase.mobi xxx dasi sex video filmi sex redwap.me marathi sexy girl video best helmets philippines teleseryerepaly.com viral scandal april 19 2022 full episode tamil xmaster pornfactory.info www indian hot video com